联系我们
联系 Pansol 的技术专家,帮助您为项目选择合适的钢模板和支撑产品。
电话
+8615194153351 +8615275190139
PANSOL 模板
工厂添加
中国山东省德州市平原县北园路 6 号

The cantilever formwork is a dedicated system developed for high-elevation pouring scenarios where through tie rods are unavailable, consisting of steel frame panels, cantilever brackets and an integrated working platform. No floor-standing scaffolding is required, and the angle of formwork and platform can be freely adjusted to adapt to complex elevations such as slopes and curved surfaces. It is widely used in hydraulic dams, bridge high piers and high-rise core tubes, greatly saving scaffold materials and erection costs while ensuring high-altitude operation safety.
| Parameter | Details |
| Application Scenario | For high concrete pouring projects where through tie rods are not allowed, such as dams and docks |
| Structure | Steel frame formwork panel + cantilever bracket + integrated working platform |
| Platform Feature | Formwork and platform angle freely adjustable |
| Scaffolding | No floor-standing scaffolding required |
| Compatibility | Compatible with steel frame, timber and aluminum formwork panels |
| Tie Rod Option | Usable with or without tie rod system |

联系 Pansol 的技术专家,帮助您为项目选择合适的钢模板和支撑产品。
+8615194153351 +8615275190139
PANSOL 模板
中国山东省德州市平原县北园路 6 号