The Heze Substation Project in Shandong Province has received a great deal of attention since its inception. This key infrastructure project aims to provide solid energy security for the economic and social development of Heze by enhancing the regional power supply capacity and optimizing the grid configuration.
Стремясь к высококачественному строительству, сторона проекта уделяет особое внимание выбору поставщиков стальных форм. В итоге, благодаря отличному качеству продукции и хорошей репутации на рынке, в тендере победила компания Panshi, поставляющая плоские и боковые формы для проекта.

As a leading company in the industry, Panshi Heavy Industries has always been committed to the refinement and innovation of steel formwork manufacturing technology. Its products have been widely praised and recognized in many major projects for their high precision, durability and ease of loading and unloading.
The cooperation with Heze Substation Project has once again demonstrated Panshi Heavy Industry’s professional strength and technological advantages in the field of electric power construction, and has made significant contributions to the smooth implementation of the project. This not only further consolidates Panshi Heavy Industry’s leading position in the industry, but also injects new impetus for the local economic and social development.