Pansol’s brand vision is to bring the quality of China’s transportation facilities to any country in the world, thanks to the fact that Pansol steel formwork has served more than a thousand highway and railroad projects. The types of road transportation projects we have served include inter-city high speed high speed rail trunk lines as well as urban ring roads and light rail transit. Our products have also been supplied for the Davao City Ring Road project in the Philippines, the construction of King Street in Dubai, and the expansion of the Dassault Sydney Railway in Guinea.
- Fecha
- octubre 6, 2026
The Tanzania Tabora–Kigoma Standard Gauge Railway Project is a major railway infrastructure project in East Africa. The bridge section was supplied by Pansol Steel Formwork, including custom cap beam steel formwork, cylindrical pier steel formwork and matching culvert flat formwork. Six truckloads of formwork were delivered in one consolidated shipment, achieving one-stop multi-product supply.- Fecha
- septiembre 5, 2026
As a key transportation trunk in western Tanzania and a priority connectivity infrastructure project in East Africa, the Tabora-Kigoma SGR involves a large number of scattered culvert structures, featuring dispersed construction sites, tight schedules and strict cost control.- Fecha
- junio 29, 2026
As a professional steel formwork manufacturer with extensive experience in CIS markets, Pansol is proud to deliver custom-engineered 33-meter precast box girder formwork systems for the Moscow-St Petersburg M11 federal highway upgrade project. This strategic Russia-Europe transport corridor demanded box girder steel formwork that could withstand extreme northern climate conditions while delivering the precision, modularity, and reusability required for large-scale precast yard mass production.- Fecha
- febrero 25, 2026
Pansol Steel Formwork, a leading Chinese manufacturer specializing in steel formwork for infrastructure projects, has recently completed the delivery of custom-designed precast TT beam molds for […]- Fecha
- mayo 26, 2025
ur new generation of standardized cantilever form travellers, backed by innovative design and superior performance, is delivering critical support to the expressway’s expansion and reconstruction project, standing as one of Pansol’s landmark bridge engineering cases in 2025.- Fecha
- abril 6, 2025
In the Ningbo-Zhoushan Railway project, the application of Pansol steel formwork reflects its key role in bridge construction. The smooth pouring of the J01# pier pile cap of the Xihoumen Highway-Railway Bridge marks a key progress in the construction of the Ningbo-Zhoushan Railway.- Fecha
- abril 5, 2025
Pansol steel formwork responds to the "geological test paper" of northern construction with technological innovation, which not only presses the "fast forward button" for high-speed rail construction, but also sets a model for quality control in complex environments for the industry.- Fecha
- 22 de octubre de 2024
The cylindrical steel formwork exported by Pansol to Dubai this time has a diameter of 0.8m-2m. With its high strength, high precision, easy disassembly and assembly, and reusability, it has become an indispensable element in the construction of a certain project in Dubai.- Fecha
- 23 de septiembre de 2024
Since May 2024, Panshi Heavy Industries has supplied a large number of high-quality bearing platform steel formwork for the Hewu High-speed Railway project, including high pile bearing platform formwork and low pile bearing platform formwork.