Pansol standard heavy-duty bridge traveler applied on Jinan Fenghuang Road Yellow River Bridge. High strength, modular design, safe & efficient for long-span overwater bridge construction in Yellow River Basin.
Spanning 411 kilometers, this railway is a critical section of Tanzania’s standard-gauge railway network, set to significantly enhance regional transport efficiency and drive economic development along the route. Pansol’s high-quality steel formwork stands as a core support ensuring engineering quality.
Factory training (Pansol bridge cantilever form traveller manufacturing base).Pansol company development, product series, technical patents, project cases.Tropical climate adaptability technology (typhoon-resistant design, high temperature and high humidity environment material selection).Southeast Asian bridge standard comparison (ASTM, ASEAN local specifications).
In order to ensure the construction quality and safety, pansol steel formwork manufacturers for the world's engineering and construction personnel to organize a winter steel formwork construction precautions for your reference.
Steel formwork is a commonly used item in bridge construction projects, mainly used for concrete pouring and forming. In addition to steel formwork, there are also other materials such as wooden formwork and plastic formwork.
In the construction of bridge engineering, before pouring the concrete, the internal structure of the steel formwork should be checked for dirt. If there is any, it should be dealt with in a timely manner to ensure that the surface of the formwork is clean.
In the construction of highway bridges, when assembling and dismantling steel formwork, if the height of the work exceeds 2 meters, it should be constructed according to the requirements of high-altitude operations.
في بداية تأسيسها، أنشأت بانسول فريق خدمة فنية بقيادة مدير المصنع نفسه. وقد توسع الفريق حتى الآن ليشمل أكثر من 50 شخصاً، وقطع ما مجموعه 100,000 كيلومتر، وخدم آلاف المشاريع الهندسية.