The project provides the manufacturer with drawings and requirements, and the manufacturer provides a preliminary design plan;
Based on the preliminary plan and the specific situation of the construction site, the project will provide a change plan. The manufacturer will finalize the plan according to the requirements, determine the construction period, and sign and confirm the project;