PANSOL T-beam formwork is a kind of prefabricated concrete component formwork used in bridge construction, which is named because its shape is similar to the English letter “T”.The structure of T-beam formwork usually consists of one main girder and one or two end girders, which are connected with each other by connectors.
It is mainly used for the construction of bridge deck slabs, abutments, cover beams and other parts of the bridge, especially suitable for highways, urban viaducts and railroad bridges.
Compared with other types of formwork, the use of T-beam formwork can improve the construction efficiency because it is prefabricated and can be installed directly on site, reducing the time and complexity of on-site casting.
Product video of pansol T-beam prefabricated steel formwork
Product Specifications
材料Q235b 钢,经久耐用,可重复使用。
交货:根据项目要求进行图纸设计和 OEM 定制。
面板厚度:6 毫米或以上。
Formwork components: one main beam formwork and one or two end beam formworks
Connecting fittings: bolts, supporting system, channel steel, etc.
表面处理:喷涂防锈漆,以减少模板生锈。
Application works: concrete pouring and molding of precast T-beam structures for bridges.
High strength and rigidity: T-beam steel formwork uses high-quality steel with thickness ≥6mm and stable supporting frame, which has high strength and rigidity and is able to withstand all kinds of loads during the construction process, including mechanical vibration, concrete weight, and so on.
Tight splicing: the splicing of T-beam steel formwork is designed tightly, the concrete surface poured with T-beam steel formwork is flat and without splices, which is not only beautiful, but also helps to improve the durability and waterproof of the structure.
Convenient disassembly and installation: the design of the formwork is easy to disassemble and install, not easy to deform, even after many times of use, it can be easy to disassemble and reuse: the design of the T-beam steel formwork is easy to disassemble and install, not easy to deform, and it can be reused for many times, which greatly reduces the cost of the project and improves the efficiency of the construction.