4월 5, 2025
Faced with the construction of aerial cap beams up to 18 meters high along the entire line, the Pansol technical team used a fully automatic hydraulic steel formwork system with millimeter-level precision to escort the pouring of 38 key nodes, creating a new industry record of completing 4 span cap beams in a single day.