Pansol’s Wall Formwork, Box Culvert Formwork and Tunnel Trolley Equipment are supplied in large quantities for underground construction of tunnels and Metro. Most of these projects are in China, including Shanghai Metro Line 21, Jinan Metro Lines 2, 4 and 6, Qingdao Metro Lines 2 and 6, Nanjing Metro Line 6, Hangzhou Metro Line 2, Wuhu Metro Line 2, and the Dalingkou Tunnel on the Suiling Expressway.
- 日付
- 4月 6, 2025
The tunnel gallery formwork carefully built by Pansol Steel Formwork Factory for the Suzhou Tunnel Project in Anhui Province, China, has shown remarkable applicability during the implementation of the project with its high efficiency, durability and excellent product quality.- 日付
- 10月 23, 2024
hanghai Metro Line 21 is the first underground metro line in Shanghai to use fast and slow trains, and Pansol Steel Formwork has customized curved formwork for this project based on its deep industry experience and technological innovation. These well-designed formwork not only meets the complex and changing construction requirements, but also provides a solid guarantee for the aesthetics and practicality of the inner space of the metro station with its excellent stability and durability.- 日付
- 9月 23, 2024
無錫地下鉄6号線の入札区間は2024年3月に正式に着工され、地下鉄は太湖新城、三陽広場などの重要な地区を通り、無錫市の都市鉄道交通ネットワークの重要な部分である。プロジェクト区間建設開始以来、盤石重工はプロジェクト建設者の信頼を得て、地下鉄側壁型枠の供給を開始した。- 日付
- 9月 23, 2024
杭州地下鉄15号線の建設が加速され、高品質の鋼製型枠の需要が高まっている。中台鋼鉄型枠メーカーは豊富な生産経験と強い技術力で、1m1.5m、1.2m1.5mなどの平型鋼など様々な仕様をプロジェクトに提供し、プロジェクトの円滑な進行を確保しています。