25. September 2024

Der außergewöhnliche Service der Pansol Steel Formwork Factory verbessert die Qualität und Effizienz von Bauprojekten

At the beginning of its establishment, Pansol established a technical service team led by the factory director himself. Up to now, the team has expanded to more than 50 people, has traveled a total of 100,000 kilometers, and served thousands of engineering projects.
25. September 2024

Pansol Subway Seitenwandschalung: Zeugnis der Stärke, vertrauenswürdige Wahl

Subway side wall formwork is a type of single-sided retaining wall formwork. It is an important tool in the urban subway construction process. It is generally composed of combined steel formwork and single-sided brackets. The strength and reusability of the steel formwork are comparatively tested.
25. September 2024

Die spezialisierten und standardisierten Vorteile der Pansol-Flachstahlschalung sind der Grund, warum sich immer mehr Bautrupps für sie entscheiden

Im Bereich des Bauwesens hat die Pansol-Flachstahlschalung aufgrund ihrer Vorteile wie hohe Effizienz, Sicherheit, Wiederverwendbarkeit und Vielseitigkeit die Gunst der Kunden gewonnen.
25. September 2024

Pansol circular column steel formwork of various specifications supplied to Shandong Qingzhang highway construction

In January 2024, Pansol Steel Formwork Manufacturer relied on its excellent strength to once again reach cooperation with China Construction Eighth Engineering Group Co., Ltd. and began to supply cylindrical steel formwork for the Qingzhang Expressway Project.
25. September 2024

Panshi Heavy Industries provides customized steel formwork for cover beams for the National Highway 228 project in Dandong, China

The G228 Dandong Line starts from Dandong, Liaoning, and ends in Dongxing, Guangxi. In April 2024, Pansol Steel Formwork Manufacturer provided a large number of high-quality cap beam formwork for a certain section of the project, contributing to the construction of this national highway that runs through the north and south of China. share of strength.
25. September 2024

Anhui Xinhang Reservoir Project_Pansol flat steel formwork

The Anhui Xinhang Reservoir Dam Project has entered a critical stage, requiring a large number of flat steel formwork for concrete pouring. Pansol Steel Formwork Manufacturer relied on its own strength to gain the trust of the project leader and provide formwork support for the project construction.